MAB first floor access update

From today until the end of August, the west end of the first floor walkway in the Main Admin Building is closed. The existing balustrade will be removed and repositioned at the edge of One West, one of the two new social learning spaces being created on the first floor.

MB1019 and MB1020 are still accessible from the east landing.

20130809-093843.jpg

Leave a Reply

Your email address will not be published. Required fields are marked *